Menu

Proposed Development Applications

30 November 2023

Construction of a multi-dwelling housing development

Exhibition Period: 30 November 2023 to 14 December 2023

File: DA2023/0650

Site: 43 Kirkham Road AUBURN NSW 2144; Lot 10 DP 4640

Proposed: Demolition of all existing structures and construction of a multi-dwelling housing development containing 7 x 2-storey townhouses with basement carpark

Contact: Emma Di Rita– 8757 9936


Construction of a 112 place centre-based child care facility

Exhibition Period: 30 November 2023 to 14 December 2023

File: DA2023/0680

Site: 607 Merrylands Road GREYSTANES NSW 2145; Lot 4 DP 9092

Proposed: Demolition of existing structures and construction of a 112 place centre-based child care facility comprising of two (2) storeys over basement car parking

Contact: Sifa KC- 8757 9937


Section 4.55(2) Modification for various amendments to the approved alterations and additions to the Registered Club (Dooleys)

Exhibition Period: 30 November 2023 to 14 December 2023

File: MOD2023/0425

Site: 17 Church Street, 1 and 2-28 Board Street, and 3-21 Ann Street, Lidcombe NSW 2141, Lot 11 DP 78789, Part Lot 13 DP 78789, Lot 15 DP 78789, Lot 1 DP 79131, Lot 2 DP 79131, Lot 3 DP 79131, Lot 11 DP 64696, Lot 12 DP 64696, Lot 13 DP 64696, Lot A DP 190260, Lot B DP 190260, Lot 1 DP 196024, Lot X DP 391142, Lot Y DP 391142, Lot B DP 395349, Lot 12 DP 741212, Lot 1 DP 741584, Lot 1 DP 712252, Lot 1 DP 779654, Lot 1 DP 798953, Lot 14 DP 976927, Lot 15 DP 976927, Lot 6 Sec a DP 979289, Lot 9 Sec a DP 979289, Lot 14 DP 1083657, Lot 14 DP 1083698, Lot 2011 DP 1225004

Proposed: Section 4.55(2) Modification for various amendments to the approved alterations and additions to the Registered Club (Dooleys) including the addition of 2 Board Street and northern end of lane way, reconfiguration of internal layout, deletion of basement addition and administration building, addition of outdoor gaming area, relocation of substation and plant equipment, changes to building elevations and landscaping, staged construction and operation, and internal construction works outside of standard hours

Contact: Haroula Michael- 8757 9403


Translations

English For translation of this page, click on the language button on the top right hand corner of this page.

لالطالع على ترجمة لهذه الصفحة، انقر على زر اللغة في الركن األيمن العلوي من هذه الصفحة. Arabic

Chinese Simplified 如需翻译本页内容,请点击页面右上角的语言按钮。

Korean 이 페이지를 번역하려면, 페이지 오른쪽 상단 모서리에 있는 언어 버튼을 클릭하십시오.

Nepali यस पृष्ठको अनुवादको लागि यस पृष्ठको शीर्षको दायााँ कु नामा रहेको भार्ा (language) बटनमा गिच्नुहोस्।

Tamil இந்தப் பக்கத்தின் ம ொழிமபயர்ப்புக்கு, இந்தப் பக்கத்தின் ம ல் வலது மூலலயில் உள்ள ம ொழிப் மபொத்தொலைச் ம ொடுக்கவும்.

Turkish Bu sayfanın çevirisi için sayfanın sağ üst köşesinde bulunan dil düğmesine tıklayın.