Menu

Developments Advertised

8 May 2025

Construction of a 72 place centre-based child care facility comprising of two (2) storeys with at-grade car parking

Exhibition Period: 8 May 2025 to 22 May 2025

File: DA2025/0246

Site: 2-4 Beresford Road GREYSTANES NSW 2145; Lot 100A DP 378901

Proposed: Demolition of existing structures and construction of a 72 place centre-based child care facility comprising of two (2) storeys with at-grade car parking

Contact: Elizabeth Chan – 8757 9932


Construction of a 2 storey medical centre, pursuant to State Environmental Planning Policy (Transport and Infrastructure) 2021 with parking for 21 vehicles

Exhibition Period: 8 May 2025 to 22 May 2025

File: DA2025/0209

Site: 48 – 50 Hawkesbury Road WESTMEAD NSW 2145; Lot 10 DP 9268 & Lot 1 DP 770050

Proposed: Demolition of existing structures and the construction of a 2 storey medical centre, pursuant to State Environmental Planning Policy (Transport and Infrastructure) 2021 with parking for 21 vehicles

Contact: Shaylin Moodliar – 8757 9313


Translations

English For translation of this page, click on the language button on the top right hand corner of this page.

لالطالع على ترجمة لهذه الصفحة، انقر على زر اللغة في الركن األيمن العلوي من هذه الصفحة.Arabic

Chinese Simplified 如需翻译本页内容,请点击页面右上角的语言按钮。

Korean이 페이지를 번역하려면, 페이지 오른쪽 상단 모서리에 있는 언어 버튼을 클릭하십시오.

Nepali यस पृष्ठको अनुवादको लागि यस पृष्ठको शीर्षको दायााँ कु नामा रहेको भार्ा (language) बटनमा गिच्नुहोस्।

Tamil இந்தப் பக்கத்தின் ம ொழிமபயர்ப்புக்கு, இந்தப் பக்கத்தின் ம ல் வலது மூலலயில் உள்ள ம ொழிப் மபொத்தொலைச் ம ொடுக்கவும்.

Turkish Bu sayfanın çevirisi için sayfanın sağ üst köşesinde bulunan dil düğmesine tıklayın.