Pool maintenance closure - Please be advised that the 25-metre pool at Wentworthville Memorial Swim Centre will be closed for scheduled maintenance from 2:30pm on Sunday 16 August until Monday 31 August 2026. During this time, all programs and classes will continue as scheduled.

Menu

Development Applications Advertised

20 August 2026

Section 8.2 Review of the Refusal of DA2025/0913 for the demolition of existing structures and construction of 2 storey development , café and centre-based childcare facility 

Exhibition Period: 20 August 2026 to 3 September 2026 

File: REV2026/0006 

Site: 44 – 46 Pegler Avenue SOUTH GRANVILLE NSW 2142; Lot 4 DP 36280 & Lot 62 Sec 1 DP 5121 

Proposed: Section 8.2 Review of the Refusal of DA2025/0913 for the demolition of existing structures, tree removal, amalgamation of two (2) lots into one (1), construction of a two (2) storey mixed use development comprising of a café, centre-based childcare facility for 80 children and six (6) office tenancies over one (1) level of basement car parking including amendments to the basement access, stormwater drainage, northern side setback and reduction to the café and office tenancy areas 

Contact: Nighat Aamir– 8757 9972


Translations

English For translation of this page, click on the language button on the top right hand corner of this page.

لالطالع على ترجمة لهذه الصفحة، انقر على زر اللغة في الركن األيمن العلوي من هذه الصفحة.Arabic

Chinese Simplified 如需翻译本页内容,请点击页面右上角的语言按钮。

Korean이 페이지를 번역하려면, 페이지 오른쪽 상단 모서리에 있는 언어 버튼을 클릭하십시오.

Nepali यस पृष्ठको अनुवादको लागि यस पृष्ठको शीर्षको दायााँ कु नामा रहेको भार्ा (language) बटनमा गिच्नुहोस्।

Tamil இந்தப் பக்கத்தின் ம ொழிமபயர்ப்புக்கு, இந்தப் பக்கத்தின் ம ல் வலது மூலலயில் உள்ள ம ொழிப் மபொத்தொலைச் ம ொடுக்கவும்.

Turkish Bu sayfanın çevirisi için sayfanın sağ üst köşesinde bulunan dil düğmesine tıklayın.