Regents Park Library Precinct Upgrade – Temporary Closure
Regents Park Library will be temporarily closed for essential upgrade works from Monday 3 August 2026 to Sunday 16 August 2026. The library will reopen to the public on Monday 17 August 2026. We apologise for any inconvenience this may cause.

Menu

Proposed Developments

18 May 2023

PROPOSED DEVELOPMENTS CURRENTLY ADVERTISED

Demolition of existing structures and construction of a 100 place centre-based child care facility

Exhibition Period: 18 May 2023 to 1 June 2023

File: DA2023/0118

Site: 12 Florence Street SOUTH WENTWORTHVILLE NSW 2145, Lot 9 DP 8773

Proposed: Demolition of existing structures and construction of a 100 place centre-based child care facility comprising of four (4) storeys over basement car parking

Contact: Phone Sifa KC on 8757 9937


Alteration to an approved childcare centre

Exhibition Period: 18 May 2023 to 1 June 2023

File: DA2023/0244

Site: 80 Pendle Way PENDLE HILL NSW 2145 - 82 Pendle Way PENDLE HILL NSW 2145, Lot 407C DP 401638, Lot 407D DP 403661

Proposed: Alteration to an approved childcare centre including additional outdoor play area and increase the total number of children from 111 children to 116 children

Contact: Phone Sifa KC on 8757 9937


Section 8.2 Review of the refusal of DA2022/0380 for demolition of existing structures and construction of a multi dwelling development comprising of six (6) dwellings

Exhibition Period: 18 May 2023 to 1 June 2023

File: REV2023/0001

Site: 78 Station Street GUILDFORD NSW 2161; Lot 19 DP 4907

Proposed: Section 8.2 Review of the refusal of DA2022/0380 for demolition of existing structures and construction of a multi dwelling development comprising of six (6) dwellings with amendments to the height, setbacks, private open space and car parking location

Contact: Phone Shaylin Moodliar on 8757 9313


Track Developments

Track the status of all developments at www.cumberland.nsw.gov.au/development-application-tracking