Site remediation works and associated tree removal within the grounds of the existing school (Guildford Public School)
Exhibition Period: 16 October 2025 to 30 October 2025
File: DA2025/0624
Site: 1A Apia Street GUILDFORD NSW 2161; Lot 1 DP 797894, Lot 2 DP 797894, Lot 3 DP 797894, Lot 4 DP 797894, Lot 415 DP 820561, Lot 5 DP 797894, Lot 6 DP 797894, Lot 69 Sec A DP 5018, Lot 69A Sec A DP 5018, Lot 70 Sec A DP 5018
Proposed: Site remediation works and associated tree removal within the grounds of the existing school (Guildford Public School)
Contact: Elizabeth Chan– 8757 9932
Various amendments to the basement approved multi dwelling development
Exhibition Period: 16 October 2025 to 30 October 2025
File: MOD2025/0315
Site: 15 Carinya Road GIRRAWEEN NSW 2145; Lot 296 DP 8768
Proposed: Section 4.55(2) Modification for various amendments to the basement, vehicle ramp, ground floor finished floor level, unit layouts, window and door locations and landscaping of the approved multi dwelling development
Contact: Vincent Alberti– 8757 9910
Translations
English For translation of this page, click on the language button on the top right hand corner of this page.
لالطالع على ترجمة لهذه الصفحة، انقر على زر اللغة في الركن األيمن العلوي من هذه الصفحة.Arabic
Chinese Simplified 如需翻译本页内容,请点击页面右上角的语言按钮。
Korean이 페이지를 번역하려면, 페이지 오른쪽 상단 모서리에 있는 언어 버튼을 클릭하십시오.
Nepali यस पृष्ठको अनुवादको लागि यस पृष्ठको शीर्षको दायााँ कु नामा रहेको भार्ा (language) बटनमा गिच्नुहोस्।
Tamil இந்தப் பக்கத்தின் ம ொழிமபயர்ப்புக்கு, இந்தப் பக்கத்தின் ம ல் வலது மூலலயில் உள்ள ம ொழிப் மபொத்தொலைச் ம ொடுக்கவும்.
Turkish Bu sayfanın çevirisi için sayfanın sağ üst köşesinde bulunan dil düğmesine tıklayın.
