PROPOSED DEVELOPMENTS CURRENTLY ADVERTISED
Construction of a 60 place centre-based child care facility comprising of two(2) storeys over basement car parking
Exhibition Period: 13 April 2023 to 27 April 2023
File: DA2023/0123
Site: 63 McArthur Street GUILDFORD NSW 2161; Lot 11 DP 1052777
Proposed: Demolition of existing structures and construction of a 60 place centre-based child care facility comprising of two(2) storeys over basement car parking
Contact: Shaylin Moodliar on 8757 9313
Construction and use of a sterilisation area for medical equipment within the existing warehouse, distribution and manufacturing facility
Exhibition Period: 13 April 2023 to 11 May 2023
File: DA2022/0705
Site: 28 Nelson Road YENNORA NSW 2161; Lot 12 DP 1262302
Proposed: Construction and use of a sterilisation area for medical equipment within the existing warehouse, distribution and manufacturing facility – POTENTIALLY HAZARDOUS INDUSTRY (under State Environmental Planning Policy (Resilience and Hazards) 2021)
Contact: Elizabeth Chan on 8757 9932
Section 4.55(2) modification for various amendments to the approved alterations and additions to the pub
Exhibition Period: 13 April 2023 to 27 April 2023
File: MOD2022/0397
Site: 46-50 Railway Street LIDCOMBE NSW 2141; Lot 1 DP 1286777
Proposed: Section 4.55(2) modification for various amendments to the approved alterations and additions to the pub including reconfigured basement lobby, TAB and mechanical plant deck, changes to glazing and openings, addition of fireplace, store rooms and acoustic balustrade to Level 1 terrace, and removal of hydrant booster from frontage and louvres from southern elevation)
Contact: Elizabeth Chan on 8757 9932
Track Developments
Track the status of all developments at www.cumberland.nsw.gov.au/development-application-tracking