Construction of a warehouse complex with associated offices comprising 44 units with basement level car park including cafe, gym and indoor recreation facility
Exhibition Period: 13 August 2024 to 27 August 2024
File: DA2024/0345
Site: 68-80 Adderley Street West AUBURN NSW 2144; Lot 1 DP 312763, Lot A DP 312763, Lot B DP 312763, Lot C DP 312763, Lot D DP 312763, Lot E DP 312763
Proposed: Demolition of existing structures, construction of a warehouse complex with associated offices comprising 44 units with basement level car park including cafe, gym and indoor recreation facility
Contact: Nighat Aamir- 8757 9972
Construction of a 10 x 2 storey multi-dwelling development
Exhibition Period: 13 August 2024 to 27 August 2024
File: DA2024/0370
Site: 20 – 22 John Street GRANVILLE NSW 2142; Lot 31 Sec 3 DP 277 & Lot 32 Sec 3 DP 277
Proposed: Demolition of all existing structures and construction of a 10 x2 storey multi-dwelling development with torrens title subdivision
Contact: Vincent Alberti- 8757 9910
Translations
English For translation of this page, click on the language button on the top right hand corner of this page.
لالطالع على ترجمة لهذه الصفحة، انقر على زر اللغة في الركن األيمن العلوي من هذه الصفحة. Arabic
Chinese Simplified 如需翻译本页内容,请点击页面右上角的语言按钮。
Korean 이 페이지를 번역하려면, 페이지 오른쪽 상단 모서리에 있는 언어 버튼을 클릭하십시오.
Nepali यस पृष्ठको अनुवादको लागि यस पृष्ठको शीर्षको दायााँ कु नामा रहेको भार्ा (language) बटनमा गिच्नुहोस्।
Tamil இந்தப் பக்கத்தின் ம ொழிமபயர்ப்புக்கு, இந்தப் பக்கத்தின் ம ல் வலது மூலலயில் உள்ள ம ொழிப் மபொத்தொலைச் ம ொடுக்கவும்.
Turkish Bu sayfanın çevirisi için sayfanın sağ üst köşesinde bulunan dil düğmesine tıklayın.