Menu

Proposed Developments Advertised

7 September 2023

PROPOSED DEVELOPMENTS CURRENTLY ADVERTISED

Construction of a 124 place two storey centre-based child care facility over basement car parking

Exhibition Period: 7 September 2023 to 21 September 2023

File: DA2023/0412

Site: 77 Smith Street WENTWORTHVILLE NSW 2145; Lot Y DP 407866

Proposed: Demolition of existing structures and construction of a 124 place two storey centre-based child care facility over basement car parking

Contact: Nighat Aamir – 8757 9972


Section 8.2 Review of conditions requiring reduction in the no. of car parking spaces to 21 and the no. of child care places to 84

Exhibition Period: 7 September 2023 to 21 September 2023

File: REV2023/0008

Site: 85 Oramzi Road GIRRAWEEN NSW 2145; Lot 324 DP 8768

Proposed: Section 8.2 Review of conditions requiring reduction in the no. of car parking spaces to 21 and the no. of child care places to 84 so as to provide 25 car parking spaces in an amended basement layout and 100 child care places

Contact: Faisal Halla – 8757 9573

 


Fuel tank replacement and associated works at the existing service station

Exhibition Period: 7 September 2023 to 21 September 2023

File: DA2023/0414

Site: 176 Fowler Road GUILDFORD NSW 2161; Lot 141 DP 715223

Proposed: Fuel tank replacement and associated works at the existing service station

Contact: Roy Wong – 8757 9744


Translations

English For translation of this page, click on the language button on the top right hand corner of this page.

لالطالع على ترجمة لهذه الصفحة، انقر على زر اللغة في الركن األيمن العلوي من هذه الصفحة. Arabic

Chinese Simplified 如需翻译本页内容,请点击页面右上角的语言按钮。

Korean 이 페이지를 번역하려면, 페이지 오른쪽 상단 모서리에 있는 언어 버튼을 클릭하십시오.

Nepali यस पृष्ठको अनुवादको लागि यस पृष्ठको शीर्षको दायााँ कु नामा रहेको भार्ा (language) बटनमा गिच्नुहोस्।

Tamil இந்தப் பக்கத்தின் ம ொழிமபயர்ப்புக்கு, இந்தப் பக்கத்தின் ம ல் வலது மூலலயில் உள்ள ம ொழிப் மபொத்தொலைச் ம ொடுக்கவும்.

Turkish Bu sayfanın çevirisi için sayfanın sağ üst köşesinde bulunan dil düğmesine tıklayın.