Menu

Proposed Development Applications

26 July 2024

Construction of an indoor and outdoor recreation facility (known as Guildford Pool)

Exhibition Period: 26 July 2024 to 23 August 2024

File: DA2024/0330

Site: 1 Tamplin Road GUILDFORD NSW 2161; Lot 21 DP 1018330

Proposed: Construction of an indoor and outdoor recreation facility (known as Guildford Pool) including change rooms, multi-purpose space, an indoor 25m program and lane pool, an outdoor 25m lane pool, external storage building, provision of signage, associated civil works and associated landscaping, including the removal of trees (Guildford Pool Modernisation Project)

Contact: Haroula Michael - 8757 9403


Translations

English For translation of this page, click on the language button on the top right hand corner of this page.

لالطالع على ترجمة لهذه الصفحة، انقر على زر اللغة في الركن األيمن العلوي من هذه الصفحة. Arabic

Chinese Simplified 如需翻译本页内容,请点击页面右上角的语言按钮。

Korean 이 페이지를 번역하려면, 페이지 오른쪽 상단 모서리에 있는 언어 버튼을 클릭하십시오.

Nepali यस पृष्ठको अनुवादको लागि यस पृष्ठको शीर्षको दायााँ कु नामा रहेको भार्ा (language) बटनमा गिच्नुहोस्।

Tamil இந்தப் பக்கத்தின் ம ொழிமபயர்ப்புக்கு, இந்தப் பக்கத்தின் ம ல் வலது மூலலயில் உள்ள ம ொழிப் மபொத்தொலைச் ம ொடுக்கவும்.

Turkish Bu sayfanın çevirisi için sayfanın sağ üst köşesinde bulunan dil düğmesine tıklayın.