The 25-metre pool at Granville Swim Centre will be temporarily closed for maintenance from Monday 13 July to Friday 17 July 2026, and will reopen on Saturday 18 July 2026. All other areas of the centre will remain open for our members and visitors to enjoy.

Menu

Development Applications Advertised

2 July 2026

Construction of a secondary dwelling, detached studio with associated site works and landscaping

Exhibition Period: 2 July 2026 to 16 July 2026

File: DA2026/0462

Site: 5 Moree Avenue WESTMEAD NSW 2145; Lot 135 DP 13731

Proposed: Demolition of existing garage with the construction of a secondary dwelling, detached studio with associated site works and landscaping.

Contact: Godfred Ankrah – 02 8757 9179


Construction of a four (4) storey affordable housing residential flat building comprising 38 residential apartments

Exhibition Period: 2 July 2026 to 16 July 2026

File: DA2026/0397

Site: 57 - 61 Pegler Avenue SOUTH GRANVILLE NSW 2142; Lot 21 DP 36280 & Lot 22 DP 36280 & Lot 23 DP 36280

Proposed: Demolition of existing structures, tree removal and construction of a four (4) storey affordable housing residential flat building comprising 38 residential apartments over basement carparking pursuant to State Environmental Planning Policy (Housing) 2021.

Contact: Emma Di Rita – 02 8757 9936


Translations

English For translation of this page, click on the language button on the top right hand corner of this page.

لالطالع على ترجمة لهذه الصفحة، انقر على زر اللغة في الركن األيمن العلوي من هذه الصفحة.Arabic

Chinese Simplified 如需翻译本页内容,请点击页面右上角的语言按钮。

Korean이 페이지를 번역하려면, 페이지 오른쪽 상단 모서리에 있는 언어 버튼을 클릭하십시오.

Nepali यस पृष्ठको अनुवादको लागि यस पृष्ठको शीर्षको दायााँ कु नामा रहेको भार्ा (language) बटनमा गिच्नुहोस्।

Tamil இந்தப் பக்கத்தின் ம ொழிமபயர்ப்புக்கு, இந்தப் பக்கத்தின் ம ல் வலது மூலலயில் உள்ள ம ொழிப் மபொத்தொலைச் ம ொடுக்கவும்.

Turkish Bu sayfanın çevirisi için sayfanın sağ üst köşesinde bulunan dil düğmesine tıklayın.